The Heart of Bay View Campaign
for John M. Hall Auditorium
|
SOUND AND ACOUSTICS
|
$580,000
|
| Sound System Replacement |
|
| Install Hearing Assistance System |
|
| Relocate Sounds Booth to Main Floor |
|
| Technical Upgrades to Organ Console |
|
| |
|
|
LIGHTING AND ELECTRICAL
|
$350,000
|
| Upgrade Audio/Visual Controls |
|
| Upgrade Recording Capacity |
|
| Lighting Instrument Upgrades |
|
| Lighting Location Upgrades |
|
| Relocate Lighting Controls to Main Floor Booth |
|
| |
|
|
SAFETY AND CODE
|
$220,000
|
| Electric Wiring Replacement |
|
| Protection Upgrade for Electrical Equipment |
|
| Balcony Railing Revisions |
|
| Accessibility Requirements |
|
| |
|
|
AMENITIES, COMFORT AND USABILITY
|
$350,000
|
| Remove Blinds and Replace System of Light Control |
|
| Partial Replacement of Main Floor Seating |
|
| Replace First Two Rows of Balcony Seating |
|
| Provide Exhaust Above Stage |
|
|
New Restroom Facilities for Performers/Participants
(This portion of the project, completed in 2010, was funded by a major gift to the Heart of Bay View Campaign by anonymous donor.)
|
|
| |
|
|
TOTAL PROJECT
|
$1,500,000
|
Related costs included in the above are
Escalation, Contingencies, General Conditions, Fundraising Fee, Architectural/Engineering Fees, Printing, Permits |
|
|